Selecting a Solar Metering Panel
Confirm the proposed solar metering panel configuration against the project requirements and approved technical documentation.
Applications for this equipment
Solar generation installations with an approved gross-metering arrangement.
Information to include with your enquiry
- Utility metering requirements
- Voltage and phases
- CT requirements
- Wiring diagram
- Installation location
Use the existing specifications above as a starting point. Confirm model-specific ratings, component details and supporting documentation for the proposed configuration before ordering.
Questions before specifying this equipment
Is gross metering the same as net metering?
Gross metering records solar generation under a gross-metering scheme. Net metering accounts for electricity import and export under a different approved arrangement. Confirm the required scheme with the utility.
Where is a solar metering panel used?
A solar metering panel houses the metering and associated connections required by the approved generation measurement scheme. Metering arrangements must follow the project and utility requirements.
What should I check when specifying a solar metering panel?
Confirm the proposed solar metering panel configuration against the project requirements and approved technical documentation.
What information does GEESYS need for a solar metering panel quotation?
Include utility metering requirements; voltage and phases; CT requirements; wiring diagram; installation location. Use the enquiry form on this page; ask the team to confirm model-specific ratings and any required customization in its proposal.
Related products and technical guidance
Request a Solar Metering Panel quote
Describe your application and electrical requirements. The GEESYS team can confirm the appropriate configuration and commercial terms.
For existing contact details and other ways to enquire, contact GEESYS.