Previous Page

Power Quality

How to Select the Right APFC Panel for an Industry

APFC selection requires measured load behaviour and power quality data. A transformer rating alone does not define the required capacitor capacity.

Determine compensation

Record real power, existing displacement power factor, reactive demand and load changes. For sinusoidal conditions, Qc = P × [tan(arccos(PF1)) − tan(arccos(PF2))], with P in kW and Qc in kVAr. Harmonic-rich installations also require analysis of distortion power factor.

Choose steps and switching

Choose small enough steps to follow light-load demand without overcompensation. Contactor switching suits slower changes; thyristor switching may suit rapid variations when properly specified.

Assess harmonics and operating conditions

Survey drives, rectifiers, UPS loads and voltage/current harmonics before deciding on standard or detuned equipment. Confirm reactor-capacitor compatibility, temperature, ventilation, CT location and generator operation. Set the target to suit the utility and site study.

Discuss your project with GEESYS

Share your load details, site conditions and single-line diagram for a project-specific recommendation.

Explore related products  |  Contact GEESYS

Further reading: Schneider Electric low-voltage power factor correction documentation.

Related technical guides

Browse all 20 guides
Need quick quote? Chat on WhatsApp
WhatsApp Sales Share enquiry instantly
GEESYS Technical Desk

Product selection and quote support

Share your requirement. We will guide you to the right product and connect you with the correct team.

Online now
Quick chat We will ask a few short questions.
Quick enquiry